Our Services

Paper Work

Construction of residential building required paper work before the start of actual construction. The paper works are preparation of drawings, estimation of material cost, labor cost & contingencies, approval of drawings from City Development Authority.

image
image

Marking of Layout

The approved plan boundaries are marked in the ground first and the ground inside and outside the layout is cleaned. Later the complete layout is marked on the ground with accurate dimension and orientation.

Excavation

Generally excavation is carried out for the construction of wall foundations. Excavation should be carried out as per the drawings defined lengths & widths. Suitable machines are used to excavate the the earth for the making of foundation.

image
image

Shuttering

To achieve proper shaped concrete, shuttering is done as per the dimensions mentioned in the drawing. It is also done so that the concrete doesn’t come in contact with the soil .

Footing Concrete

It is very necessary to check the levels of foundation before concrete work. There are patches where excavated depth slightly exceeds and vice versa. Concrete is poured as per drawing specs. Depth of foundation varies from 9” to 18” and normally for most of the cases it is considered as 12’’ depth. The foundation width is kept equals to its depth.

image
image

Column Casting

Casting of columns is made by fixing the shuttering framework and concrete is poured in the formwork. The shuttering is usually removed after 24hr of casting and curing is done.

Construction of Walls

Walls are constructed using many materials such as brick, wooden, precast concrete and many other. Before starting the wall construction the base of wall is constructed first using concrete or size stone masonry. The height of the walls depends upon the floor height. Necessary opening are to given for doors, windows and ventilators.

image
image

Lintel

Masonry work of buildings is carried out in one go till roof. Openings for windows & doors are left during masonry works. Reinforced cement concrete beams are laid down on the top of openings. So, those loads of structure above openings not directly come on to the door frames.

Roofing

Roof slab of building is poured after completion of masonry works. Now a days, roofing is of reinforced cement concrete slab. Slab thickness & reinforcement details should be according to approved drawings.

image
image

Plastering Work

Form work is removed after 14 days of slab pouring. Now plaster work begins. Mortar for plaster work is generally of 1:3 or 1:4 is used. Thickness of plaster layer should not be more than 0.75inch. Cure the surface about 7 days. So that, plaster gain proper strength. Generally, internal walls of buildings are covered with plastered layer and external walls with pointing. It is better plaster the external walls rather than pointing.

Fixing of Doors and Windows

Traditionally, doors and windows of woods are used. But, steel & aluminum is also not a bad choice. In case of wooden doors & windows, frames are fixed in walls during masonry work. Panels are then fixed with hinges after plaster work. Steel and aluminum doors are fixed after completion of paint works.

image
image

Fixing of Electrical and Plumbing Works

The necessary electrical and plumbing works are carried out before the final finishing works such as painting and tiles laying is done so as to reduce the damage.

Tiles Laying

Majorly tiles are laid in the bathrooms and kitchen area. First the wall tiles are fixed after which the floor tiles are fixed. For flooring works, granite, marble, tiles , epoxy are also used.

image
image

Painting

Painting consists of different sequences depending upon the type of finished required. 1 coat of primer and 2 coat of water based paint is also done or 2 coat of putty and 2 coats of painting is done for the smooth finish. It defers for outside and inside works.

Miscellaneous Works

Other than all these above mentioned works, there are other works that are carried as per the requirement of the consumer and design engineer.

  • Sump
  • Sewage Tank
  • Over Head Water Tank
  • Compound wall
  • Terrace water proofing
  • landscaping works
  • False Ceiling
  • Safety Grill Work
  • Gate work
  • Installation of Furniture